Modular prefabricated building used as a sports changing room
Premium changing rooms: the project for a Serie A Team
When professional football demands infrastructure worthy of the top league, Mobile System responds with complex modular prefabricated engineering. A prestigious Serie A sports club chose us to design and build the new changing rooms for their women’s team, with the goal of combining technical functionality and high-level design.
Beyond the container changing room
The project stems from the assembly of twelve prefabricated modules, configured to create a complex and totally independent structure. These are not simple modules, but an advanced facility solution that integrates:
- Changing and wellness area: spacious and comfortable areas dedicated to the athletes, with shower and bathroom zones designed to handle high-traffic flows in full compliance with health and hygiene regulations.
- Integrated technical room: a technological core that manages the entire systems engineering of the complex.
- Energy efficiency: the structure is equipped with solar panels for clean energy production, as well as heating and cooling systems to ensure thermal comfort in every season.
Aesthetics and architectural integration: the value of design
One of the main challenges was the aesthetic integration with the pre-existing building. To meet the club’s need for elegance and visual consistency, we meticulously crafted the exterior design:
- PVC slat facade: we opted for an exterior slatted cladding made of advanced polymeric material.
- Two-Tone effect: the use of a dual-color scheme allowed us to “mask” the modular nature of the structure, ensuring a modern aesthetic that blends perfectly with the surrounding architecture.
Why choose Mobile System modular solutions for sports?
Our prefabricated structures for sports centers represent the ideal choice for clubs that need rapid operational outposts without sacrificing Serie A build quality.
- Sustainability: integration of renewable energy (photovoltaics).
- Total customization: from exterior cladding to interior layouts.
- Record times: from design to commissioning, timelines are drastically reduced compared to traditional construction.